Höegh LNG and Altera Infrastructure is scaling up large scale CCS infrastructure

Tore Lunde1

1Höegh LNG, Norway

Baltic Carbon Forum, Vol. 1, 2022, p. 5-5. https://doi.org/10.21595/bcf.2022.22844
Accepted 8 August 2022; published 13 October 2022

Baltic Carbon Forum 2022 in Kaunas, Lithuania, October 13-14, 2022

Copyright © 2022 Tore Lunde. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Creative Commons License
Table of Contents Download PDF
Cite this article
Views 18
Reads 0
Downloads 90
CrossRef Citations 0
Abstract.

In a joint initiative, called “Stella Maris CCS” Altera Infrastructure and Höegh LNG are working together to provide cost efficient floating Carbon Capture and Storage infrastructure solutions for a global market, not limited to size or geographical location.

Valuable infrastructure experience is brought together; with FPSO (Floating Production, Storage and Offloading) and Dynamically Positioned Shuttle Tankers from Altera and FSRU’s (Floating Storage Regasification Unit) from Höegh. We intend to continue to build on our heritage and experience, using our combined skills to contribute to carbon emission reduction around globe. With the “Stella Maris CCS” project, we will essentially be doing what we are doing today, only in reverse. Our solution, initiated in 2019 as the first of its kind, will offer a large-scale floating infrastructure for collection, transport, and injection of CO2 into subsea reservoirs/aquifers.

Our infrastructure concept consists of 2-3 Carbon Collection Storage Units (CCSU) to aggregate volumes at different key locations, 3-4 CO2 Shuttle Carriers and one Floating Storage and Injection Unit, the total amount of CO2 injected with these assets can reach up to 10 million tons per year.

In order to realize large scale CCS, the unit costs must come down, and the barriers for emitting industries to invest in capture plants must be lowered. With Stella Maris we are addressing these hurdles. The larger ship design enables carrying volumes of CO2 at low pressure and will allow for greater economies of scale in the absence of a pipeline which places less limitations on distance to reservoir and ultimate flow capacity. Having a centralized conditioning of CO2 in a CCSO hub allows more flexibility for on-site capture design from multiple onshore industrial emission sources with shared port access. To defray high logistics cost in e.g. the Baltic region, a hub and spoke transportation approach enables collection in smaller parcels, milk-run gathering and conditioning for large scale transfer for storage in an offshore subsea reservoir on the Norwegian Continental shelf.

Keywords: CCS infrastructure solution, large scale, one-shop-stop CCS.