Published: 31 March 2012

Experimental investigation of interference fit connection of mechanical components

J. Mikolainis1
B. Bakšys2
Views 1
Reads 0
Downloads 1855

Abstract

The experimental setup was mounted, that allows monitoring and analyzing the vibratory connection process of a shaft and the bushing, when they are joined with interference. While changing the parameters of oscillations, the shaft and bushing connection time may be significantly reduced. Increasing the amplitude and frequency of vibrations also allows bigger penetration of the shaft into the bushing. The increase of pressing force allows reliable shaft connection in a wider frequency and amplitude range. It also helps to shorten the insertion time under constant parameters of vibrations.

About this article

Received
11 September 2011
Accepted
14 February 2012
Published
31 March 2012
Keywords
interference fit
vibratory connection
automatic assembly